Akoinn ®   09-Feb-2026 14:18
I would like to ask about your experience regarding the preparation of cargo holds before loading.
Very often the vessel receives detailed instructions from the shipper, charterer, or agent concerning the required condition of the cargo holds.
Increasingly, these requirements are as strict as those for grain, even for cargoes that normally would not demand such a high standard. Sometimes there are even requests to repaint the holds.
However, during inspections in port, it frequently happens that the surveyor does not actually enter the hold.
Instead, they only take a quick look from the top and confirm that everything is acceptable.
What are your experiences or opinions on this matter?
0
Reply
   Attach screenshots
Heads necessary to send messages to enable JavaScript
refresh list

Similar topics

Bulk Cargo - Peter Grunau [2017, PDF]
RightShip Inspection Ship Questionnaire (RISQ) - RightShip [2021, PDF]
Pre-loading Steel Survey - NorthStandard [2024, PDF]
RightShip Inspection Ship Questionnaire (RISQ) 3.2 - RightShip [2025, PDF]
Bulk cargoes - Hold preparation and cleaning - Chris Spenzer [2011, PDF]
Tank cleaning guides for oil tankers - Various [2016, Other]
Bulk cargo checklists: Grain, Coal, Nickel Ore [Loss prevention] - The North of England P&I Associat...
Off-Hire: Hold Inspections - NorthStandard [2024, PDF]
IMSBC Code (Incorporating Amendment 03-15 and Supplement) - IMO [2016, PDF]
Loading, Discharging & Voyage Instructions to Vessel - UREA
LOAD MORE
  • Reply

The time now is: Today 08:54

All times are GMT + 3 Hours